Generator test & run log

Cited baseline

Record generator tests, run time, transfer and issues — one running log per set, printed for the file.

Keep your logs in a free account. Which fits you?

Try it free for your first year. Limited time. No card needed.

Another kind of building? See CompliMaint for facility teams.

One log per set

A building with two generators has two maintenance histories, and a single sheet interleaving them is a sheet nobody can read when it matters. Add each set once; each keeps its own entries and prints its own log, so “the log for the north generator” is a thing that exists.

Record what actually happened

The duration you really got, the alarm text as the panel showed it, the weep at the upper hose — and, beside each finding, what was done about it. A log of perfect runs tells you nothing about a machine whose whole job is to work on the one day you find out.

The load question is the one worth answering honestly. A diesel set exercised repeatedly at light load does not burn off carbon, and that is a common reason a generator with a spotless run log fails under real demand.

Where the intervals come from

EPSS inspection — fuel, oil, coolant, batteries, charger, leaks. Walk the generator without starting it: fuel level and no leaks, oil and coolant levels, battery terminals clean, charger showing float, block heater warm, louvers clear, and the switch still in AUTO. NFPA 110 §8.4.1 (weekly inspection), cited from the 2022 edition; CMS holds certified nursing facilities to the 2010 edition (42 CFR §483.90), and elsewhere the edition your state or AHJ adopted governs. Record: checklist log. Retention: per authority.

Exercise under load — ≥30 min, ≥30% nameplate (diesel). Run the generator under real load for at least 30 minutes at 30% or more of its nameplate rating. Running it unloaded is what causes wet stacking and eventual failure, so light load does not count. NFPA 110 §8.4.2 (monthly load run), cited from the 2022 edition; CMS holds certified nursing facilities to the 2010 edition (42 CFR §483.90), and elsewhere the edition your state or AHJ adopted governs. Record: run log: load, duration, transfer. Retention: per authority.

This is the national consensus baseline, with the edition each figure was checked against. Whether it applies to your building — and at what frequency — depends on the code edition your jurisdiction has adopted, your occupancy, your equipment's listing, the manufacturer's instructions and your authority having jurisdiction. Confirm it with them. This tool records what you did; it makes no determination that any facility is compliant.

The semi-annual EPSS inspection, the load bank test — owed only where the monthly exercises did not meet the NFPA 110 load criteria, and a gap in this log is a reading to find rather than proof that it is owed — and the three-yearly four-hour full-load test for a Level 1 system are separate exercises, usually by a contractor, and nothing here performs or certifies them.

The rest of the round

The two monthly walks that go with this are the extinguisher inspection log and the emergency lighting test log. The compliance calendar puts all of it on dates with the code behind each, and the PM checklist covers the mechanical rounds.

In a care home this log sits beside the fire drill log, the water temperature and smoke alarm logs and the emergency plan builder. Saved records are kept by building on My Facility, and every tool for care homes is on the assisted living page.

Example entry

Maple Court Assisted Living — a fictional facility, for illustration only.

Date and timeTestRun timeResultFindingCorrective action
Apr 3, 2026, 9:00 AMExercise / run, under load30 minNeeds attentionLow coolant warning on the panel after 20 minutes.Coolant topped up; service visit booked for Apr 10 to look for a leak (work order 1182).
Mar 6, 2026, 9:05 AMTransfer test15 minPassNone.None needed.

This log records the tests you run. It sets no testing frequency — that comes from the codes your jurisdiction has adopted, your license, your facility's policy and the manufacturer's instructions.

How to use this log

  1. Enter the facility's name and address, and the generator's location, make and rating, once — they print at the top of the log.
  2. Record each test after it has run: date and start time, type of test, how long it ran, whether it was under load, transfer and fuel.
  3. Mark the result. Where something was wrong, write the finding and the corrective action in their own fields, with a reference to any evidence — a photo, a work order or a vendor report.
  4. Build the log, print it or save it as a PDF, and keep it with the facility's records.

A record of tests you ran. CompliMaint issues no certifications and makes no determination that any facility is compliant — your authority having jurisdiction does that. Everything runs on your device.

Questions people ask

What should a generator test log record?
The date and start time, how long the set actually ran, what kind of test it was — a routine exercise, a transfer test, a load test — whether it ran under load and at roughly what percentage of nameplate, whether automatic transfer was observed, the fuel level and condition, any alarms or faults with the exact panel message, anything you saw or heard that was not right, the result, and what was done about it. Then who ran it.
How often does an emergency generator have to be tested?
NFPA 110 describes a weekly inspection of the emergency power supply system and a monthly exercise under load for systems within its scope, and this tool shows that baseline with the edition it was checked against. Whether it applies to your set — and at what interval — depends on the code edition your jurisdiction has adopted, the system's classification, the manufacturer's instructions, your facility policy and your authority having jurisdiction. This tool records what you ran; it does not decide what you owe.
What goes under Finding, and what under Corrective action?
The finding is what was wrong, written as you saw it — the exact panel message, the leak, the transfer that did not happen. The corrective action is what was done about it, by whom and when, or what has been booked. They print in separate columns, so a reviewer can see both, and a run marked as needing attention is listed with the open items at the foot of the log. Add a reference to any evidence — a photo, a work order or a vendor report number.
Why does running the generator with no load matter?
A diesel set run repeatedly at light load does not get hot enough to burn off unburned fuel and carbon, which accumulates in the exhaust — commonly called wet stacking — and it is one of the more common reasons a generator that has been exercised every month for years fails when it is needed. That is why the log asks whether the run was under load and at roughly what percentage, rather than just how long it ran.