Construction
Quality
Inspected, accepted, or written up
- Punch listThe list standing between you and your retainage.
- Concrete pour recordEvery ticket, quantity and measurement, recorded exactly as taken.
- Pre-pour checklistThe walk before the trucks, written down with a name against each check.
- Excavation inspection recordDepth, protection, access and water — what somebody saw, on a date, with a name on it.
- Waterproofing inspection logStage by stage, what was seen before the work disappeared under everything else.
- Nonconformance logWhat was found, who it sits with, what was agreed, and whether it is closed.
- Inspection request logWhen you asked, who you asked, the reference they gave you, and what you were told.
- Equipment inspection recordEach machine on site with its meter reading and what the person who looked at it found.
- Concrete test resultsWhat the laboratory returned, placement by placement, at each age.
- Compaction test logThe percentage reported at each location, with the reference beside it.
What quality covers in Construction
Inspected, accepted, or written up. That is the job Quality does inside CompliMaint Construction, and it holds 10 tools for it — inspections to record, things to log, problems to see through and registers to keep. Each opens at its own address, free, with no account and nothing to install. The app around them is for field reporting, rfis, submittals, materials and the money that moves with them.
The questions this section answers
- Close out a job — Punch List & Closeout
- Log the pour, load by load — Concrete Pour Record
- Check before the concrete comes — Concrete Pre-Pour Checklist
- Record what the trench looked like — Excavation & Trench Inspection Record
- Record it before it is covered — Waterproofing Installation Inspection Log
- Raise work that is not right — Construction Nonconformance (NCR) Log
- Track an inspection you asked for — Construction Inspection Request Log
- Check the plant on site — Construction Equipment Inspection Record
- Keep the lab results against the pour — Concrete Test Result Log
- Keep the compaction figures by location — Soil Compaction Test Log
4 inspections to record: walked, checked, and what was found written down. 3 things to log: written down on the day it happened. 2 problems to see through: raised, owned and closed out. 1 register to keep: held now so the question can be answered later.
Connected CompliMaint apps
- CompliMaint Services — Customers, the diary, estimates and invoices — the whole of a service business. 3 tools in quality are work Services does too, at the same address.
- CompliMaint Property — The records a tenancy produces, each carrying the statute that governs it. 1 tool in quality is work Property does too, at the same address.
Where to go next
- Preconstruction — Before anybody is on site — 7 tools
- Field — Who was on site, what happened, what it cost in time — 12 tools
- Safety — What was observed, and what was protected — 6 tools
- Cost — What the contract is worth now, and what was asked — 7 tools
- Closeout — Everything the owner is owed before it is finished — 7 tools
- Environment — What was carried away, what was discharged, and what was held back — 3 tools
- Documents — Everything you have filed, ready to reopen or print