Construction
Safety
What was observed, and what was protected
- Safety observation logWhat was seen on site, where, and what was done about it — conditions, not people.
- Temporary protection checklistWhat was covered, when it came off, and the condition of the finish underneath.
- Permit to work indexAn index of the permits issued under your own system, and where each one stands.
- Scaffold inspection logWhat was observed at each scaffold, and what the tag said.
- Fall protection inspectionWhat each item looked like, and what you took out of service.
- Lifting gear inspectionWhat was found on each sling, shackle or hoist, and what came out of use.
What safety covers in Construction
What was observed, and what was protected. That is the job Safety does inside CompliMaint Construction, and it holds 6 tools for it — inspections to record and registers to keep. Each opens at its own address, free, with no account and nothing to install. The app around them is for field reporting, rfis, submittals, materials and the money that moves with them.
The questions this section answers
- Write down what the walk found — Construction Safety Observation Log
- Prove what was under the covering — Construction Temporary Protection Log
- Find the permit that covers this work — Permit to Work Index
- Write down what you saw at the scaffold — Scaffold Inspection Log
- Check the harnesses and write it down — Fall Protection Equipment Inspection Log
- Look over the rigging and record it — Lifting Equipment & Rigging Inspection Log
4 inspections to record: walked, checked, and what was found written down. 2 registers to keep: held now so the question can be answered later.
Connected CompliMaint apps
- CompliMaint Facilities — Know what is required, do it on the day, keep the record that proves it. 4 tools in safety are work Facilities does too, at the same address.
- CompliMaint Services — Customers, the diary, estimates and invoices — the whole of a service business. 2 tools in safety are work Services does too, at the same address.
Where to go next
- Preconstruction — Before anybody is on site — 7 tools
- Field — Who was on site, what happened, what it cost in time — 12 tools
- Quality — Inspected, accepted, or written up — 10 tools
- Cost — What the contract is worth now, and what was asked — 7 tools
- Closeout — Everything the owner is owed before it is finished — 7 tools
- Environment — What was carried away, what was discharged, and what was held back — 3 tools
- Documents — Everything you have filed, ready to reopen or print