Concrete test results

Readings log

What the laboratory returned, placement by placement, at each age.

The results, against the placement they came from

A break result on its own is a number. Against the placement, the age, the mix and the supplier it is evidence, and that is how it has to be filed to be worth anything later.

No criterion is supplied and no verdict is issued

The acceptance rule for concrete lives in the specification and with the engineer of record. A website that printed one would be putting a threshold on somebody's quality record that nobody in the contract had agreed.

Around it

The pour itself is the concrete pour record. What the checks before it were is the pre-pour checklist.

A record of results a laboratory returned. It supplies no strength acceptance criterion, applies none, reaches no mix-design conclusion and issues no pass or fail. Everything runs on your device.

Questions people ask

Does it tell me whether the concrete passed?
No. It supplies no acceptance criterion, applies none and issues no pass or fail. Whether a result is acceptable is decided by your specification, by the engineer of record and by whoever administers the contract.
Can I put my specified strength in?
Yes — as a figure copied from your own documents, in a field that says so. It is recorded beside the results and nothing is compared against it. You may also set your own range, and the log will flag readings outside YOUR figure and call it yours.
Does it evaluate the mix design?
No. The mix reference and the supplier are recorded as written. Nothing here reads a mix design, evaluates one or reaches any conclusion about it.
Is this the test report?
No. The laboratory's report is the record, and there is a field to note that you hold it. This log is your index of what it said, kept where you can find it against the placement.