Construction
Environment
What was carried away, what was discharged, and what was held back
- Waste transfer logEach load, the carrier, where they said it went, and the docket number.
- Dewatering logPump hours, volume, what treatment was used, and where it went.
- Erosion control inspectionWhat each silt fence, trap or inlet looked like on the day.
What environment covers in Construction
What was carried away, what was discharged, and what was held back. That is the job Environment does inside CompliMaint Construction, and it holds 3 tools for it — things to log and inspections to record. Each opens at its own address, free, with no account and nothing to install. The app around them is for field reporting, rfis, submittals, materials and the money that moves with them.
The questions this section answers
- Record what left site — Site Waste Transfer Log
- Record what was pumped and to where — Dewatering & Discharge Log
- Walk the controls and record them — Erosion & Sediment Control Inspection Log
2 things to log: written down on the day it happened. 1 inspection to record: walked, checked, and what was found written down.
Connected CompliMaint apps
- CompliMaint Facilities — Know what is required, do it on the day, keep the record that proves it. 3 tools in environment are work Facilities does too, at the same address.
Where to go next
- Preconstruction — Before anybody is on site — 7 tools
- Field — Who was on site, what happened, what it cost in time — 12 tools
- Quality — Inspected, accepted, or written up — 10 tools
- Safety — What was observed, and what was protected — 6 tools
- Cost — What the contract is worth now, and what was asked — 7 tools
- Closeout — Everything the owner is owed before it is finished — 7 tools
- Documents — Everything you have filed, ready to reopen or print