WorksheetApproved budget against committed and spent, line by line — with nothing judged for you.
Two columns and the truth between them
Approved budget on one side, committed and spent on the other, and the difference in whole cents and as a percentage of the line. That is the whole tool.
Nothing is judged for you
No line is colored, flagged or called a problem until you type a threshold of your own — and where you have not, a line reads as not assessed rather than as fine.
It hangs off a project
A project has a stable id, so renaming it moves nothing and two projects with the same name stay two projects.
Alongside this: Budget vs actual · Project status · Change requests
A worksheet that does arithmetic on figures you entered. CompliMaint supplies no threshold, makes no judgment about whether a variance is acceptable or material, forecasts nothing, applies no accounting treatment and gives no financial advice. Everything runs on your device.
Questions people ask
- Does it tell me if I am over budget?
- It shows you the variance. It does not tell you whether that variance is good, bad, acceptable or material — that is a judgment about your project, made by somebody who knows it.
- Is there a default threshold?
- No, and that is deliberate. The highlight percentage is blank on purpose; leave it blank and nothing is flagged. A threshold shipped in the tool would make a materiality judgment for everybody who never changed a number they never saw.
- Why is this scoped to a project rather than a job?
- Because a job in this product is accepted contracted work with a frozen contract sum, and an internal program or a fit-out is not that. A project has an id of its own, so the budget hangs off the right thing.
- Does it forecast the final cost?
- No. It states what was budgeted and what has been committed or spent, both of which are your figures.
- Is this accounting?
- No. No accounting treatment is applied and no accruals are computed.