Free tool · No signup · NFPA 101 / NFPA 105

Egress & Smoke Barrier Inspections (NFPA 101)

The NFPA 101 health care occupancy schedule for corridors, smoke barriers and hazardous-area doors — four monthly walks your staff log themselves, plus the annual smoke door assembly inspection.

  1. 1Address
  2. 2Facility
  3. 3Systems
  4. 4Details
  5. 5Dates
  6. 6Review
Facility address

Printed on every output — the calendar header and log sheets. You can skip it and add it later.

Free · No signup. Your dates and facility details stay on your device — every calculation happens on your device.

NFPA 101 / NFPA 105 schedule

Every requirement carries its code section and the edition it was verified against. ★ = qualified in-house under the national code, but licensing commonly required locally — confirm with your AHJ.

The four monthly checks below are CompliMaint’s recommended cadence, not a code interval. NFPA 101 requires corridor doors to latch, hazardous-area doors to self-close and self-latch, smoke barriers to stay sealed and decorations to stay within flame-spread and corridor-width limits — as a continuous condition. It sets no inspection frequency for any of them, so a monthly walk is how a facility keeps that condition true and can evidence it, not a duty NFPA 101 imposes. The annual smoke door assembly inspection is a stated interval (NFPA 105 Ch. 5). These sections are NFPA 101 Chapter 19 — existing health care occupancies. They are not the schedule for an office, a warehouse or a general commercial building, which fall under other chapters of the same code. The section numbers are the 2012 edition, the one CMS adopted; the current published edition is 2024 and your state fire marshal may enforce a third. Where a door is part of a rated assembly, its listing and the manufacturer’s instructions govern how it is inspected.

TaskFrequencyWho may performCode (edition)Record
Corridor door check — latching, no impediments, no unapproved hold-opensMonthlyIn-house (basic)NFPA 101 §19.3.6 (2012)Rounds log.
Smoke barrier and fire wall inspection — penetrations, above ceilingMonthlyIn-house (basic)NFPA 101 §19.3.7 (2012)Barrier log with locations.
Hazardous area door check — self-closing and latchingMonthlyIn-house (basic)NFPA 101 §19.3.2 (2012)Rounds log.
Decoration and corridor projection check — flame spread and clearanceMonthlyIn-house (basic)NFPA 101 §19.7.5 (2012)Rounds log.

Record it: Build the monthly rounds sheet · Record the smoke and corridor door checks · See what a surveyor asks for, state by state

Other schedules: NFPA 25 (water supply) · NFPA 25 · NFPA 72 · NFPA 96 · NFPA 110

National consensus-standard baseline with the edition noted per item. Your state, fire marshal, or accrediting body may require more frequent service or licensed personnel where a qualified person is shown. General information, not legal or engineering advice — confirm with your AHJ.

Questions people ask

How often does NFPA 101 / NFPA 105 require inspection?
NFPA 101 / NFPA 105 sets a schedule from monthly intervals. The full task-by-task table with code sections and who may perform each task is shown above, and the calendar builder dates it from your real last-completed dates.
Which of these tasks can be done in-house?
Tasks marked Tier 1 or Tier 2 can be performed by trained facility staff with documentation under the national code. Tier 3 tasks require a certified or licensed professional. Starred tasks are qualified in-house under the national code but licensing is commonly required locally — confirm with your AHJ.