Unit turn / make-ready checklist
Every line marked OK, needs work or N/A — and the work on your punch list.
Walk the unit once, in the order you actually walk it. Anything you mark as needing work goes to the punch list when you say so — not before, and nothing raises a work order on its own. A line you have not looked at stays blank on the printed sheet rather than quietly reading as passed.
What the make-ready checklist is for
Walk a vacant unit room by room, in the order you actually walk it. Mark each line OK, needs work or N/A; anything that needs work goes to your punch list when you say so, matched by id so re-sending updates the row instead of duplicating it. A line nobody looked at stays blank on the printed sheet rather than quietly reading as passed — which is the difference between a checklist and a rubber stamp. The thing you came to do is “turn a vacant unit”, and this is the page that does it.
It is filed under property & tenancy — rent, deposits, condition reports and turns — and under “plan something”, which is programs, schedules and what is coming. There is one page for it, at this address, however you arrived.
When people reach for it
- Every line marked OK, needs work or N/A — and the work on your punch list — people arrive here typing “void”, “void turnaround”, “turn a unit”.
What it records, and where the record goes
Every line marked OK, needs work or N/A — and the work on your punch list. What you enter stays in this browser, on this device. There is no account to make and nothing is uploaded; it reaches another device only if you activate CompliMaint Cloud Beta and sign in.
- Records — every document this device holds, filed as you work.
- CompliMaint Property — The records a tenancy produces, each carrying the statute that governs it.
- Turns — Between one tenancy and the next.
Related tools and workflows
- Move-In / Move-Out Condition Report — Timestamped move-in / move-out walkthrough. Also in Turns.
- Move-In Orientation & Welcome Checklist — Keys, utilities, contacts and how to report a repair — as a working list. Also in Turns.
- Unit Turn / Make-Ready Cost Calculator — Itemized make-ready cost, timeline, and a crew checklist. Also in Turns.
- EPA Lead-Safe (RRP) Rule Checker — Does the lead rule apply to this job? A straight answer. Also in Turns.
- Property Handover Checklist — Your own tasks when a whole property changes managing agent. Also in Turns.
- Vacancy & Turnover Report — Which units are empty, since when, and what your turn estimates came to. Also in Turns.
- Utility Transfer Log — Which service moved to whom, from what date, with the reading you took. Also in Turns.