Lightning protection inspection log

Log

What you saw on the system, and what the instrument showed.

A visual walk, and the continuity you measured

Terminals upright, conductors unbroken, fasteners holding, bonds tight, grounds located. Then whatever your instrument showed on continuity, recorded with the instrument named.

New rooftop equipment is an observation, not a decision

Somebody puts a condenser on the roof and nobody tells the lightning protection contractor. The checklist asks you to note it so it can be passed on. It does not decide whether the new equipment needs bonding — that is your installer's determination.

No value, no level, no claim

CompliMaint states no inspection interval, publishes no resistance or continuity figure, assigns no protection level or class, and makes no determination that any structure is protected or compliant. Those come from the standard the system was designed to and from the people who certify it.

Kept alongside: Roof inspection record · Panel schedule · Storm preparedness log

A visual and continuity record for a lightning protection system, kept per system on your device. CompliMaint states no inspection interval, publishes no resistance or continuity value, assigns no protection level or class, and makes no determination that any structure is protected, adequately protected or compliant with anything. There is no commercial, affiliate or referral placement on this page. Everything runs on your device.

Questions people ask

What resistance reading is acceptable?
CompliMaint publishes none. Record what your instrument showed and which instrument it was; what the figure means comes from the standard your system was designed to and from the people who certify it.
How often should the system be inspected?
This product states no interval. It comes from the standard the system was designed to and from your own arrangements with your installer.
Does a completed inspection mean the building is protected?
No. It makes no protection determination of any kind. It records what somebody saw and measured.
What if new equipment has appeared on the roof?
Note it on the checklist item that asks, so it can be passed to your installer. CompliMaint does not decide whether it needs bonding.
Is anything transmitted?
No. Systems, inspections and readings stay in this browser.
Does the page carry advertising or referrals?
No. There is no commercial, affiliate or referral placement on this page, and a test asserts its absence.