Submittal log

Register

What was sent for review, who has it, when it is due back, and what the reviewer actually returned.

The rounds are the record

A submittal that went out, came back for revision, went out again and was approved has a history worth keeping — and the stage list is built for it. Not sent, submitted, revise and resubmit, approved, closed. Nothing here collapses a return into a rejection, because returns are how the process is supposed to work.

What it does not do

It does not review anything, approve anything, or decide whether a submittal conforms to a specification. It states no review period. It generates no submittal number: the contract or your own convention does that, and a number this site invented would be one nobody else on the job could find.

Beside it on the job

The questions that a submittal raises go in the RFI register. What a subcontractor’s package actually includes is the scope checklist. And when the answer changes the work, that is a change order with a number and a signature.

A record of what was submitted and what came back. This tool reviews nothing and approves nothing: approval is the reviewer's, and how long they have is in your contract. CompliMaint makes no determination about conformance with any specification. Everything runs on your device.

Questions people ask

What counts as a submittal?
Whatever your contract says has to be reviewed before it is built or installed — typically shop drawings, product data, samples, mock-ups and closeout documents. This tool does not decide what is submittable: it keeps the register of what you sent and what came back, with the specification section beside it if you record one.
Why is 'revise and resubmit' not shown as a failure?
Because it usually is not one. Most submittals come back at least once, and a log that colored an ordinary return as a rejection would make a healthy job read as a troubled one. Returned means it is back with you and still yours; the register keeps the history of every round.
Does it track review time against the contract?
It shows you what is past the return date YOU entered. It states no review period of its own, because how long a reviewer has is in your contract and this product has not read it. The dated record is what any conversation about review time would be built from.
Can two jobs share a submittal log?
No. Every row is attached to one job by its stable id, so two jobs never see each other's submittals, and renaming a job or its customer moves nothing. That is the same rule every register in this product follows.