Emergency plan rules in North Carolina

One licence type researched, regulated by North Carolina DHHS — Division of Health Service Regulation. Every requirement below carries the rule that imposes it.

Assisted living / residential care

Licensed in North Carolina as Adult Care Home, by North Carolina DHHS — Division of Health Service Regulation.

10A NCAC 13G .0316 (fire safety and emergency preparedness plan / disaster plan)

Drills

At least four rehearsals of the fire evacuation plan each year.

What happens to the plan

Two separate filings, on two different clocks. A NEWLY LICENSED facility must submit its emergency preparedness plan to the local emergency management agency within 30 DAYS of obtaining the licence; already-licensed facilities submit annually. Separately, records of the fire evacuation rehearsals are maintained and copies furnished to the COUNTY DEPARTMENT OF SOCIAL SERVICES annually.

Authority: Local emergency management agency; and the county department of social services

Cadence: Within 30 days of a new licence, then annually

North Carolina-specific requirements
The plan goes on the wall, in large print, approved by the code official

A written fire evacuation plan including a DIAGRAMMED DRAWING, carrying the approval of the local code enforcement official, prepared in LARGE PRINT and posted in a central location ON EACH FLOOR. Three requirements most plans miss: the drawing, the outside approval, and the type size.

10A NCAC 13G .0316

Reviewed 2026-07-30

Build a North Carolina emergency plan →

What this page is

The requirements North Carolina places on a facility emergency preparedness plan, taken from the state’s own rules rather than a national template. Where we have confirmed something against primary text it is stated plainly; where we have not, it says so and names what to check. Nothing here is inferred from what other states do.

The part that is the same everywhere

The federal floor does not vary by state. OSHA 29 CFR §1910.38 binds any employer: reporting an emergency, evacuation and exit-route assignments, critical-operations shutdown, accounting for everyone afterwards, rescue and medical duties, and naming who to ask about the plan. That layer, plus the exit-route, alarm and first-aid rules and the fire code’s plan structure, is covered in the main crash course rather than repeated on all fifty state pages.

Write the plan

The Emergency Plan Builder produces the document itself and is driven by this same research, so the two cannot disagree about what North Carolina requires. The Compliance Calendar puts the drills and inspections on dates.