Free tool · No signup · NFPA 80

Fire Door Inspection Requirements (NFPA 80)

The NFPA 80 fire door schedule — monthly visual checks your staff can do and the annual 13-criteria assembly inspection.

  1. 1Address
  2. 2Facility
  3. 3Systems
  4. 4Details
  5. 5Dates
  6. 6Review
Facility address

Printed on every output — the calendar header and log sheets. You can skip it and add it later.

Free · No signup. Everything is computed on your device — nothing is uploaded.

NFPA 80 schedule

Every requirement carries its code section and the edition it was verified against. ★ = qualified in-house under the national code, but licensing commonly required locally — confirm with your AHJ.

TaskFrequencyWho may performCode (edition)Record
Fire door visual — not propped, unobstructed, undamaged, labels visibleMonthlyIn-house (basic)NFPA 80 §5.2 (periodic) (2022)Log
Annual assembly inspection & functional test (13 criteria)AnnualIn-house (qualified)NFPA 80 §5.2.1 (annual, 13 criteria) (2022)Written record for AHJ

Other schedules: NFPA 25 · NFPA 72 · NFPA 96 · NFPA 110 · NFPA 10

National consensus-standard baseline with the edition noted per item. Your state, fire marshal, or accrediting body may require more frequent service or licensed personnel where a qualified person is shown. General information, not legal or engineering advice — confirm with your AHJ.