South Dakota survey readiness
What South Dakota Department of Health — Health Facility Licensure can ask you for, each line cited — and the ones you can't yet produce.
29 of the outstanding items are the ones a survey opens with.
What South Dakota requires
- Your fire and evacuation drill records for the period. Drills at the required frequency: Fire drills quarterly for each shift — but if the facility does NOT operate three shifts, it must instead run MONTHLY drills so that all personnel are trained. Fewer shifts means more frequent drills, which is the opposite of the intuition. S.D. Admin. R. art. 44:70 (assisted living centers); fire protection at ch. 44:70:03
- Judged against time-to-escape. The facility must be constructed, arranged, equipped, maintained and operated to avoid undue danger to occupants from fire, smoke, fumes or resulting panic during the period of time reasonably necessary for escape. South Dakota frames the standard around how long escape actually takes from this building, which is what makes the drill timing evidence matter. S.D. Admin. R. ch. 44:70:03
The evidence, and where it comes from
Every item above needs something you can hand over. The South Dakota fire drill log produces the drill record at the frequency this state sets, the emergency plan builder writes the plan itself from the same research, and the compliance calendar puts the life-safety tests on dates. Anything you record against the building shows up on the checklist already ticked.
A self-assessment against published rules, not a compliance determination. CompliMaint issues nothing — South Dakota Department of Health — Health Facility Licensure and your authority having jurisdiction do. Requirements we could not verify are absent rather than guessed at.