Nevada survey readiness

What Nevada Division of Public and Behavioral Health — Bureau of Health Care Quality and Compliance can ask you for, each line cited — and the ones you can't yet produce.

The building

Nevada requirements loaded — the rules below are Nevada’s own.

0 of 28 ready.

28 of the outstanding items are the ones a survey opens with.

One thing we couldn’t confirm.

We have not confirmed Nevada's drill frequency for this licence class, so no frequency is stated. Confirm which NAC 449 subchapter governs residential facilities for groups specifically, versus hospitals and other medical facilities — the monthly fire drill and annual per-shift disaster drill were found without a clear class scope.

NevadaResidential Facility for Groups

What Nevada Division of Public and Behavioral Health — Bureau of Health Care Quality and Compliance can ask for, each cited. Checked July 2026.

Must be done, on a scheduleWhen did it last happen, and was that inside the interval?

Nevada's surveyor interpretive guidelines for residential facilities for groups accept that caregivers working different shifts may participate in drills, and that SILENT DRILLS may be run with staff on the graveyard shift in large facilities. Nevada resolves the night-drill-versus-resident-sleep tension explicitly, where most states leave operators guessing.

Nevada DPBH, Residential Facilities for Groups — interpretive guidelines · Nevada Division of Public and Behavioral Health — Bureau of Health Care Quality and Compliance

Produce this →

Life-safety systems

The code-based tests a life-safety survey opens with. These are the starred ones — the full schedule is the compliance calendar.

Test record

NFPA 72 Table 14.4.3.2 (supervisory device testing) (2022) · national · keep: Minimum 5 years

Produce this →

Certificate + inspection report

NFPA 72 §14.4 (annual ITM) (2022) · national · keep: Minimum 5 years

Produce this →

Test record

NFPA 25 §5.3.3 / §13.7 (2023) · national · keep: Life of system

Produce this →

Static + residual pressures; compare to prior; >10% drop investigated

NFPA 25 §5.3.3 (main drain quarterly where sole supply passes through backflow preventer or PRV) (2023) · national · keep: Life of system

Produce this →

Pressures vs prior year

NFPA 25 §13.2.5 (2023) · national · keep: Life of system

Produce this →

Written record for AHJ

NFPA 80 §5.2.1 (annual, 13 criteria) (2022) · national · keep: 3 years

Produce this →

Report

NFPA 110 §8.3.1 (2022) · national · keep: Per authority

Produce this →

Damper log with location, ID, pass/fail and corrective action.

NFPA 80 §19.4 / NFPA 105 Ch. 6 (2022) · national · keep: Until the next test, minimum 3 years

Produce this →

Written report listing every damper by location with pass/fail

NFPA 80 §19.4 / NFPA 105 Ch. 6 (hospital 6-year interval) (2022) · national · keep: Until the next test, minimum 3 years

Produce this →

Monthly firefighter service log.

ASME A17.1 §8.6.11.1 (2019) · state-governed · keep: Minimum 3 years

Produce this →

Trip test report with trip time and water delivery time.

NFPA 25 §13.4.4.2.2 (3-year full trip) (2020) · national · keep: Minimum 3 years

Produce this →

Tank inspection report.

NFPA 25 §9.2.6 (interior inspection) (2020) · national · keep: Until the next interior inspection

Produce this →

Smoke control test report with fan and damper positions.

NFPA 92 §8.4.2 (dedicated: semiannual) (2021) · national · keep: Minimum 3 years

Produce this →

Signed drill sheet: date, time, shift, participants, evacuation time.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

Signed drill sheet.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

Signed drill sheet.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

After-action report and improvement plan.

42 CFR §483.73(d)(2) (—) · national · keep: Minimum 3 years

Produce this →

Signed HVA.

42 CFR §483.73(a)(1) (—) · national · keep: Minimum 3 years

Produce this →

Dated plan revision.

42 CFR §483.73(a) (—) · national · keep: Minimum 3 years

Produce this →

Dated plan revision and team roster.

ASHRAE 188 / CMS QSO-17-30 (2018) · national · keep: Survey cycle

Produce this →

Readings against control limits.

ASHRAE 188 §7 (2018) · national · keep: Survey cycle

Produce this →

Receptacle test record by room.

NFPA 99 §6.3.3.2 (12-month interval applies to receptacles not listed hospital grade) (2021) · national · keep: Minimum 3 years

Produce this →

Rounds log.

NFPA 101 §19.3.6 (2012) · national · keep: Survey cycle

Produce this →

Barrier log with locations.

NFPA 101 §19.3.7 (2012) · national · keep: Survey cycle

Produce this →

Photo of posting with date.

29 CFR §1904.32(b)(6) (—) · national · keep: 5 years

Produce this →

Temperature log by unit.

FDA Food Code §3-501.16 (cold holding, as adopted by your state) (2022) · state-governed · keep: Minimum 1 year

Produce this →

Inspection report and corrective-action record.

Local AHJ (—) · local · keep: Minimum 3 years

Produce this →

What Nevada requires

Residential Facility for GroupsGroup home / residential care home
  • Silent drills are allowed on the graveyard shift. Nevada's surveyor interpretive guidelines for residential facilities for groups accept that caregivers working different shifts may participate in drills, and that SILENT DRILLS may be run with staff on the graveyard shift in large facilities. Nevada resolves the night-drill-versus-resident-sleep tension explicitly, where most states leave operators guessing. Nevada DPBH, Residential Facilities for Groups — interpretive guidelines
Nevada Division of Public and Behavioral Health — Bureau of Health Care Quality and Compliance · checked July 2026We have not confirmed Nevada's drill frequency for this licence class, so no frequency is stated. Confirm which NAC 449 subchapter governs residential facilities for groups specifically, versus hospitals and other medical facilities — the monthly fire drill and annual per-shift disaster drill were found without a clear class scope.

The evidence, and where it comes from

Every item above needs something you can hand over. The Nevada fire drill log produces the drill record at the frequency this state sets, the emergency plan builder writes the plan itself from the same research, and the compliance calendar puts the life-safety tests on dates. Anything you record against the building shows up on the checklist already ticked.

Everything else we’ve researched about Nevada

Same state, the problems either side of this one. Each carries its own statute and the date we last checked it.

A self-assessment against published rules, not a compliance determination. CompliMaint issues nothing — Nevada Division of Public and Behavioral Health — Bureau of Health Care Quality and Compliance and your authority having jurisdiction do. Requirements we could not verify are absent rather than guessed at.