Massachusetts survey readiness

What Massachusetts Executive Office of Elder Affairs (EOEA) can ask you for, each line cited — and the ones you can't yet produce.

The building

Massachusetts requirements loaded — the rules below are Massachusetts’s own.

0 of 30 ready.

30 of the outstanding items are the ones a survey opens with.

MassachusettsAssisted Living Residence (ALR) — certified, not licensed

What Massachusetts Executive Office of Elder Affairs (EOEA) can ask for, each cited. Checked July 2026.

Goes in the planIs the section written, and does it say what the rule requires?

Massachusetts requires the residence to give every resident a copy of the instructions they will be given under the disaster and emergency plan. Most states require the plan to exist; this one requires it to have been handed to each resident in a form they can act on.

651 CMR 12.00 · Massachusetts Executive Office of Elder Affairs (EOEA)

Produce this →

Must be filed or approvedWas it sent — and where approval is required, was it approved?

All assisted living residences must submit their current, site-specific disaster and emergency response plan to the state. 'Site-specific' is the operative word — a corporate template covering several residences does not satisfy it.

651 CMR 12.00 · The Commonwealth (EOEA)

Produce this →

Must be done, on a scheduleWhen did it last happen, and was that inside the interval?

Drills at the required frequency: Annual simulated evacuation drills and rehearsals, for all shifts.

651 CMR 12.00 · Massachusetts Executive Office of Elder Affairs (EOEA)

Produce this →

Massachusetts requires the residence to give every resident a copy of the instructions they will be given under the disaster and emergency plan. Most states require the plan to exist; this one requires it to have been handed to each resident in a form they can act on.

651 CMR 12.00 · Massachusetts Executive Office of Elder Affairs (EOEA)

Produce this →

Records to retainHow far back can you produce the records?

Drills at the required frequency: Annual simulated evacuation drills and rehearsals, for all shifts.

651 CMR 12.00 · Massachusetts Executive Office of Elder Affairs (EOEA)

Produce this →

Life-safety systems

The code-based tests a life-safety survey opens with. These are the starred ones — the full schedule is the compliance calendar.

Test record

NFPA 72 Table 14.4.3.2 (supervisory device testing) (2022) · national · keep: Minimum 5 years

Produce this →

Certificate + inspection report

NFPA 72 §14.4 (annual ITM) (2022) · national · keep: Minimum 5 years

Produce this →

Test record

NFPA 25 §5.3.3 / §13.7 (2023) · national · keep: Life of system

Produce this →

Static + residual pressures; compare to prior; >10% drop investigated

NFPA 25 §5.3.3 (main drain quarterly where sole supply passes through backflow preventer or PRV) (2023) · national · keep: Life of system

Produce this →

Pressures vs prior year

NFPA 25 §13.2.5 (2023) · national · keep: Life of system

Produce this →

Written record for AHJ

NFPA 80 §5.2.1 (annual, 13 criteria) (2022) · national · keep: 3 years

Produce this →

Report

NFPA 110 §8.3.1 (2022) · national · keep: Per authority

Produce this →

Damper log with location, ID, pass/fail and corrective action.

NFPA 80 §19.4 / NFPA 105 Ch. 6 (2022) · national · keep: Until the next test, minimum 3 years

Produce this →

Written report listing every damper by location with pass/fail

NFPA 80 §19.4 / NFPA 105 Ch. 6 (hospital 6-year interval) (2022) · national · keep: Until the next test, minimum 3 years

Produce this →

Monthly firefighter service log.

ASME A17.1 §8.6.11.1 (2019) · state-governed · keep: Minimum 3 years

Produce this →

Trip test report with trip time and water delivery time.

NFPA 25 §13.4.4.2.2 (3-year full trip) (2020) · national · keep: Minimum 3 years

Produce this →

Tank inspection report.

NFPA 25 §9.2.6 (interior inspection) (2020) · national · keep: Until the next interior inspection

Produce this →

Smoke control test report with fan and damper positions.

NFPA 92 §8.4.2 (dedicated: semiannual) (2021) · national · keep: Minimum 3 years

Produce this →

Signed drill sheet: date, time, shift, participants, evacuation time.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

Signed drill sheet.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

Signed drill sheet.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

After-action report and improvement plan.

42 CFR §483.73(d)(2) (—) · national · keep: Minimum 3 years

Produce this →

Signed HVA.

42 CFR §483.73(a)(1) (—) · national · keep: Minimum 3 years

Produce this →

Dated plan revision.

42 CFR §483.73(a) (—) · national · keep: Minimum 3 years

Produce this →

Dated plan revision and team roster.

ASHRAE 188 / CMS QSO-17-30 (2018) · national · keep: Survey cycle

Produce this →

Readings against control limits.

ASHRAE 188 §7 (2018) · national · keep: Survey cycle

Produce this →

Receptacle test record by room.

NFPA 99 §6.3.3.2 (12-month interval applies to receptacles not listed hospital grade) (2021) · national · keep: Minimum 3 years

Produce this →

Rounds log.

NFPA 101 §19.3.6 (2012) · national · keep: Survey cycle

Produce this →

Barrier log with locations.

NFPA 101 §19.3.7 (2012) · national · keep: Survey cycle

Produce this →

Photo of posting with date.

29 CFR §1904.32(b)(6) (—) · national · keep: 5 years

Produce this →

Temperature log by unit.

FDA Food Code §3-501.16 (cold holding, as adopted by your state) (2022) · state-governed · keep: Minimum 1 year

Produce this →

Inspection report and corrective-action record.

Local AHJ (—) · local · keep: Minimum 3 years

Produce this →

What Massachusetts requires

Assisted Living Residence (ALR) — certified, not licensedAssisted living / residential care
  • Your fire and evacuation drill records for the period. Drills at the required frequency: Annual simulated evacuation drills and rehearsals, for all shifts. 651 CMR 12.00
  • Proof your plan was filed, and the date it went. All assisted living residences must submit their current, site-specific disaster and emergency response plan to the state. 'Site-specific' is the operative word — a corporate template covering several residences does not satisfy it. 651 CMR 12.00
  • Every resident gets a copy of their own instructions. Massachusetts requires the residence to give every resident a copy of the instructions they will be given under the disaster and emergency plan. Most states require the plan to exist; this one requires it to have been handed to each resident in a form they can act on. 651 CMR 12.00
Massachusetts Executive Office of Elder Affairs (EOEA) · checked July 2026
Long-Term Care FacilitySkilled nursing facility
  • Your fire and evacuation drill records for the period. Drills at the required frequency: Simulated drills testing the effectiveness of the plan, conducted for all shifts at least twice a year. 105 CMR 150.000; drills at 105 CMR 150.015(E)(4)
Massachusetts Department of Public Health · checked July 2026

The evidence, and where it comes from

Every item above needs something you can hand over. The Massachusetts fire drill log produces the drill record at the frequency this state sets, the emergency plan builder writes the plan itself from the same research, and the compliance calendar puts the life-safety tests on dates. Anything you record against the building shows up on the checklist already ticked.

Everything else we’ve researched about Massachusetts

Same state, the problems either side of this one. Each carries its own statute and the date we last checked it.

A self-assessment against published rules, not a compliance determination. CompliMaint issues nothing — Massachusetts Executive Office of Elder Affairs (EOEA) and your authority having jurisdiction do. Requirements we could not verify are absent rather than guessed at.