Idaho survey readiness

What Idaho Dept. of Health & Welfare — Residential Assisted Living Program can ask you for, each line cited — and the ones you can't yet produce.

The building

Idaho requirements loaded — the rules below are Idaho’s own.

0 of 28 ready.

28 of the outstanding items are the ones a survey opens with.

IdahoResidential Assisted Living Facility

What Idaho Dept. of Health & Welfare — Residential Assisted Living Program can ask for, each cited. Checked July 2026.

Must be done, on a scheduleWhen did it last happen, and was that inside the interval?

Drills at the required frequency: Not fewer than six fire drills a year on a bimonthly basis, of which at least two are conducted at night while residents are sleeping.

IDAPA 16.03.22 (residential care or assisted living facilities); emergency actions and fire drills at 16.03.22.410 · Idaho Dept. of Health & Welfare — Residential Assisted Living Program

Produce this →

Records to retainHow far back can you produce the records?

Drills at the required frequency: Not fewer than six fire drills a year on a bimonthly basis, of which at least two are conducted at night while residents are sleeping.

IDAPA 16.03.22 (residential care or assisted living facilities); emergency actions and fire drills at 16.03.22.410 · Idaho Dept. of Health & Welfare — Residential Assisted Living Program

Produce this →

Life-safety systems

The code-based tests a life-safety survey opens with. These are the starred ones — the full schedule is the compliance calendar.

Test record

NFPA 72 Table 14.4.3.2 (supervisory device testing) (2022) · national · keep: Minimum 5 years

Produce this →

Certificate + inspection report

NFPA 72 §14.4 (annual ITM) (2022) · national · keep: Minimum 5 years

Produce this →

Test record

NFPA 25 §5.3.3 / §13.7 (2023) · national · keep: Life of system

Produce this →

Static + residual pressures; compare to prior; >10% drop investigated

NFPA 25 §5.3.3 (main drain quarterly where sole supply passes through backflow preventer or PRV) (2023) · national · keep: Life of system

Produce this →

Pressures vs prior year

NFPA 25 §13.2.5 (2023) · national · keep: Life of system

Produce this →

Written record for AHJ

NFPA 80 §5.2.1 (annual, 13 criteria) (2022) · national · keep: 3 years

Produce this →

Report

NFPA 110 §8.3.1 (2022) · national · keep: Per authority

Produce this →

Damper log with location, ID, pass/fail and corrective action.

NFPA 80 §19.4 / NFPA 105 Ch. 6 (2022) · national · keep: Until the next test, minimum 3 years

Produce this →

Written report listing every damper by location with pass/fail

NFPA 80 §19.4 / NFPA 105 Ch. 6 (hospital 6-year interval) (2022) · national · keep: Until the next test, minimum 3 years

Produce this →

Monthly firefighter service log.

ASME A17.1 §8.6.11.1 (2019) · state-governed · keep: Minimum 3 years

Produce this →

Trip test report with trip time and water delivery time.

NFPA 25 §13.4.4.2.2 (3-year full trip) (2020) · national · keep: Minimum 3 years

Produce this →

Tank inspection report.

NFPA 25 §9.2.6 (interior inspection) (2020) · national · keep: Until the next interior inspection

Produce this →

Smoke control test report with fan and damper positions.

NFPA 92 §8.4.2 (dedicated: semiannual) (2021) · national · keep: Minimum 3 years

Produce this →

Signed drill sheet: date, time, shift, participants, evacuation time.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

Signed drill sheet.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

Signed drill sheet.

NFPA 101 §19.7.1 / CMS LSC (2012) · national · keep: Survey cycle

Produce this →

After-action report and improvement plan.

42 CFR §483.73(d)(2) (—) · national · keep: Minimum 3 years

Produce this →

Signed HVA.

42 CFR §483.73(a)(1) (—) · national · keep: Minimum 3 years

Produce this →

Dated plan revision.

42 CFR §483.73(a) (—) · national · keep: Minimum 3 years

Produce this →

Dated plan revision and team roster.

ASHRAE 188 / CMS QSO-17-30 (2018) · national · keep: Survey cycle

Produce this →

Readings against control limits.

ASHRAE 188 §7 (2018) · national · keep: Survey cycle

Produce this →

Receptacle test record by room.

NFPA 99 §6.3.3.2 (12-month interval applies to receptacles not listed hospital grade) (2021) · national · keep: Minimum 3 years

Produce this →

Rounds log.

NFPA 101 §19.3.6 (2012) · national · keep: Survey cycle

Produce this →

Barrier log with locations.

NFPA 101 §19.3.7 (2012) · national · keep: Survey cycle

Produce this →

Photo of posting with date.

29 CFR §1904.32(b)(6) (—) · national · keep: 5 years

Produce this →

Temperature log by unit.

FDA Food Code §3-501.16 (cold holding, as adopted by your state) (2022) · state-governed · keep: Minimum 1 year

Produce this →

Inspection report and corrective-action record.

Local AHJ (—) · local · keep: Minimum 3 years

Produce this →

What Idaho requires

Residential Assisted Living FacilityAssisted living / residential care
  • Your fire and evacuation drill records for the period. Drills at the required frequency: Not fewer than six fire drills a year on a bimonthly basis, of which at least two are conducted at night while residents are sleeping. IDAPA 16.03.22 (residential care or assisted living facilities); emergency actions and fire drills at 16.03.22.410
Idaho Dept. of Health & Welfare — Residential Assisted Living Program · checked July 2026

The evidence, and where it comes from

Every item above needs something you can hand over. The Idaho fire drill log produces the drill record at the frequency this state sets, the emergency plan builder writes the plan itself from the same research, and the compliance calendar puts the life-safety tests on dates. Anything you record against the building shows up on the checklist already ticked.

A self-assessment against published rules, not a compliance determination. CompliMaint issues nothing — Idaho Dept. of Health & Welfare — Residential Assisted Living Program and your authority having jurisdiction do. Requirements we could not verify are absent rather than guessed at.