Move-In / Move-Out Inspection Checklist
Unit-level condition documentation for turnovers and deposit disputes — with photos on every finding. Read the full checklist below, or run it on your phone and get a professional PDF report — condition score, findings by severity with photos, and repair-cost ranges.
What are you inspecting?
Pick the closest match.
Free · No signup · Your photos and notes stay on this device.
The move-out inspection checklist
Every item is rated Good, Fair, or Poor with photos and notes; Poor items get a severity tier, and where relevant a repair-cost range and remaining-useful-life estimate.
Interiors / Common Areas
- Flooring
- Walls / ceilings — stains = water history
- Lobby / hallways / laundry
- Appliances
- Pest evidence
- Odors (mold / gas)Critical
Plumbing
- Water heater — age / leaks / anode
- Water pressure
- Visible leaks & supply lines
- Backflow preventer test tag
- Drains
- Fixtures
- Signs of past water damage (ceiling stains)
Electrical
- Panel — condition / labeling / clearanceCritical
- Breaker issuesCritical
- GFCI in wet areas
- Exposed wiringCritical
- Exterior / emergency lighting operation
Building Exterior / Envelope
- Siding / stucco / masonry — cracks or water intrusion
- Exterior caulking & weatherstripping
- Windows / seals
- Doors / hardware
- Balconies / railingsCritical
- Exterior stairwellsCritical
- Foundation — visible cracksCritical
Life Safety
- Smoke & CO detectors testedCritical
- Fire extinguishers charged + current tagCritical
- Fire alarm panel statusCritical
- Sprinkler heads clearCritical
- Exits unblockedCritical
- Exit signs litCritical
- Egress paths clearCritical
Questions
What's on a move-out inspection checklist?
Unit-level condition documentation for turnovers and deposit disputes — with photos on every finding. It covers interiors / common areas, plumbing, electrical, building exterior / envelope, life safety — each item rated with photos, notes, and (where relevant) repair-cost and remaining-useful-life estimates.
How long does due diligence take?
Typically about 2–6 weeks, depending on deal size. A standardized checklist keeps the physical assessment consistent so defects surface early rather than after closing.
Is it really free?
Yes — free, no signup, no watermark. Run the inspection on your phone and download a professional PDF report.
Other checklists: Apartment Due Diligence Inspection Checklist · Commercial Property Condition Assessment Checklist · Office Property Condition Assessment Checklist · Warehouse Property Condition Assessment Checklist · All types
Bought it? Turn the findings into a preventive-maintenance schedule →
Want to hear when we launch a new free tool? No spam — a few emails a year, unsubscribe anytime.
Last reviewed July 2026. This checklist and free tool produce a visual condition assessment, not an engineering evaluation, appraisal, or warranty. Repair-cost and useful-life figures are rough planning estimates that must be verified by licensed professionals.